Planning Workflow and Approvals: Deciding When a Number Is Final

 

1. The application works. That is not the same as the budget working.

Blog 9 left our application in a good place. Cube have data in them. Actuals load through Data Integration every month. The forms from Blog 7 open in under three seconds and people have stopped emailing me about zero suppression.

Then we handed it to forty planners for the FY27 cycle, and within a week the finance director asked a question the application could not answer: is the Singapore marketing number final?

Nothing in the app knew. The number was in the cube. Someone had typed it. Whether that someone was done typing, whether their manager had seen it, and whether it was safe to build the consolidated board pack on top of it — none of that was anywhere. The FP&A lead was tracking it in a spreadsheet with 42 rows and a column of colours, which is exactly the thing we sold them an EPM system to stop doing.

That gap is what Approvals fills. It is the least glamorous module in EPM Planning and the one that decides whether your implementation is a modelling tool or an actual planning process.

2. What Approvals actually is

Approvals is the workflow engine built into EPM Planning. Strip away the terminology and it does three things:

1.   It assigns ownership of a slice of data. Not a form, not a report — a slice. One named person is accountable for those numbers.

2.   It tracks a status on that slice. Not Started, First Pass, Under Review, Approved, and so on, visible to everyone with access.

3.   It controls who can write. This is the one nobody expects. Once a slice moves up the path, the person who used to own it goes read-only on it.

Point three is why Approvals is not optional cosmetic workflow. It changes write access at runtime, on top of the security you already configured. Get it wrong and people who should be planning cannot type, or people who should be finished still can.

3. The approval unit is a data slice, and you should count them

Everything in Approvals hangs off one object: the approval unit. An approval unit is the intersection of

•    one Scenario member,

•    one Version member,

•    one member of the primary approval dimension — Entity, in almost every implementation you will ever do,

•    and optionally one member of a secondary dimension.

 

So at NEXUSFPA, FY27_Budget / Working / C_NX_SG_MKT is one approval unit: the Singapore marketing cost centre's FY27 budget in the working version. That is the thing that gets an owner, a status, and a lock.

Now do the arithmetic before you build anything, because it is the single decision that most often wrecks a cycle:

 

Design

Approval units

What review actually feels like

1 scenario x 1 version x 42 cost centres

42

A review meeting. One screen, sortable, done in 20 minutes.

Same, plus a secondary dimension of 5 verticals

210

A spreadsheet of statuses. Which is what we were replacing.

Same, plus Budget and Forecast, Working and Final

840

Verbally Nobody knows what is approved, what was draft and so on.

 

Note: The secondary dimension is the most common piece of over-engineering in an EPBCS approvals design. Use the secondary dimension only when the two genuine approval is required.

4. Building the approval unit hierarchy

The approval unit hierarchy (AUH — older documentation and half the consulting world still calls it the planning unit hierarchy or PUH) is where you define the whole thing. Navigator, then Approvals, then Approval Unit Hierarchy, then Create. Four decisions and then a lot of clicking.

4.1 Approval dimension and type

You pick the primary dimension and the hierarchy template on the first tab. The dimension is Entity unless you have a very specific reason. The template is where the interesting choice lives, and section 5 is entirely about it.

4.2 Primary and subhierarchy selection

This is the tab people rush. You choose which members of the Entity dimension are actually in the workflow, and for each parent you decide whether its descendants come along. Two behaviours to burn into your memory:

•    Enabled vs included. A member can be in the hierarchy but not enabled for approvals — it will pass status up from its children without having an owner of its own. Useful for reporting rollups nobody signs off on.

•    Members you skip do not error. They simply are not governed. No warning, no flag, no red text.

4.3 Owners and reviewers

Each approval unit gets exactly one owner and any number of reviewers. Watchers can be added too — they receive notifications and see status but take no action, which is the right slot for the CFO who wants visibility without a decision to make during the initial days of budget process.

If you leave an approval unit without an assignment, it inherits from the nearest ancestor that has one. That is a genuinely useful default: assign the regional owner at the parent, override only where a specific cost centre needs a specific person.

4.4 Scenario and version assignment

The last tab is the one that makes the hierarchy live. Until you assign a Scenario and Version combination to the AUH, it is an inert design document. Assign FY27_Budget / Working and now those slices are governed. Do not assign Forecast / Working and it stays wide open all year — see failure mode six.

Then Validate, then Save. Validate catches broken promotional paths and missing owners; run it and read what it says rather than clicking through.

5. Bottom Up, Distribute, or Free Form

Three templates. The difference is not cosmetic — it decides where the process starts and which direction data authority flows.

 

Template

How it moves

Use it when

The catch

Bottom Up

Owners at level 0 enter and Promote upward. Status rolls up the hierarchy.

Cost centre managers build their own numbers and finance consolidates. The default for most budgets, including NEXUSFPA.

No mechanism to hand down a target. Corporate targets end up in email.

Distribute

The top owner enters targets and distributes downward; children work within them and submit back up.

Corporate sets the envelope first — a revenue target, a headcount cap — and the detail is filled in underneath.

The top of the house must be ready first. If corporate slips a week, forty planners sit idle.

Free Form

The promotional path is chosen by the person promoting, at the moment they promote.

The approval chain genuinely does not follow the entity hierarchy — matrix organisations, shared service centres.

You have traded a designed process for user discretion. Expect inconsistency and no clean status rollup.

 

My opinion, and it is only that: start Bottom Up. It matches how most finance teams already work, it is the easiest to explain in training, and the target-setting problem it does not solve can be handled by loading targets into a separate version and giving planners a variance column on the form. Distribute is the right answer roughly one engagement in four, and it is always an engagement where the CFO drives the calendar personally.

6. The promotional path

The promotional path is the ordered list of people an approval unit passes through. You do not draw it. EPM computes it from the hierarchy plus the owners and reviewers you assigned, and you can see it on the approval unit before you start the cycle.

For a Bottom Up hierarchy at NEXUSFPA, the Singapore marketing slice reads roughly like this:

C_NX_SG_MKT   Owner: SG_MKT_PLANNERS      status: First Pass

                         Reviewer: SG_FIN_MANAGERS

   |  Promote

   v

C_NX_SG       Owner: SG_FIN_MANAGERS      status: Under Review

   |  Promote

   v

C_NX_TOTAL    Owner: GROUP_FPA            status: Under Review

   |  Approve

   v

                                          status: Approved

 

Read that path out loud in the design workshop with the actual names in it. It takes four minutes and it surfaces every org-chart argument you would otherwise discover in UAT.

7. Statuses and actions: the state machine

Approvals is a state machine with a small vocabulary. Learn the states first; the buttons make sense afterwards.

 

Status

What it means

Who can write

Not Started

The process has not begun. Approvals is defined but not governing.

Whoever security allows — i.e. approvals is doing nothing yet

First Pass

Started, no owner has taken it forward yet. Data entry stage.

The owner (and reviewers, depending on your setup)

Under Review

Promoted at least one level. Sitting with a reviewer.

The current owner only

Signed Off / Not Signed Off

A reviewer has recorded an opinion without moving the unit.

Unchanged by the sign-off itself

Approved

Reached the top of the path and been approved.

Nobody in the workflow

Delegated

Ownership passed sideways to someone off the designed path.

The delegate

Distributed

Distribute-type only: targets pushed down, children now working.

The children

 

Action

Effect

Notes from the field

Start / Originate

Moves Not Started to First Pass. The cycle is now live.

Administrators forget this and wonder why nothing is locked.

Promote

Sends the unit to the next person on the path.

The former owner loses write access here. Tell people in advance.

Submit

Distribute-type equivalent of Promote, moving back up.

Same lock behaviour.

Approve / Reject

Approve moves it up or closes it. Reject sends it back down.

Reject returns ownership. It does not return the data.

Delegate

Hands ownership to someone not on the path.

Useful for leave cover. Audit it — delegation chains get untidy.

Take Ownership

Pulls ownership up to a higher-level owner.

The escape hatch when someone is unreachable at 6pm on deadline day.

Freeze / Unfreeze

Makes the slice read-only without moving it along the path.

The right tool for "stop typing while I run the consolidation."

Exclude / Include

Removes an approval unit from the process, or puts it back.

For entities that exist in the hierarchy but are not planned this cycle.

Reassign

Administrator override of owner or reviewer.

Your emergency button. Keep the list of who can press it short.

 

8. Data validation rules: where workflow becomes policy

This is the feature that turns Approvals from status tracking into control, and it is chronically underused. Data validation rules are built in the form designer — you define a condition on a cell or range, and one of the available actions is to block promotion.

At NEXUSFPA we put three of them on the opex entry form:

Rule: FPAOPX_VAL_01   Marketing spend within policy

  If   Account = A_NX_MKT_TOTAL

       Value  > 12% of FPAPLN Net Revenue for the same Entity/Period

  Then Display cell red

       Message "Marketing exceeds 12% of revenue - attach justification"

       Do Not Promote

 

Rule: FPAOPX_VAL_02   Cost per FTE sanity band

  If   A_NX_PAYROLL_TOTAL / A_NX_HC_CLOSING outside 40,000 - 220,000

  Then Display cell amber, Message, promotion allowed

 

Rule: FPAOPX_VAL_03   No blank months

  If   any month in &PlanYear = #Missing for A_NX_OPEX_TOTAL

  Then Do Not Promote

 

Rules fire on save and again on promote. VAL_03 alone eliminated the annual ritual where three cost centres submit a budget with September empty and nobody notices until the phasing looks strange in the board pack.

 

9. Where Approvals collides with everything else

Approvals does not operate in isolation. A planner can write to a cell only when four separate things agree.

 

Gate

What it checks

Typical symptom when it is the culprit

Access permissions

Write access to the dimension members via user or group.

Read-only for one user, fine for their colleague.

Approval ownership

The user is the current owner of the approval unit.

Read-only for a whole cost centre, and only after promotion.

Scenario / Version period range

The period sits inside the scenario start and end, and the version is not marked read-only.

Read-only for everyone, everywhere, in specific months.

Valid intersections

The cell combination is permitted by your valid-intersection groups.

Read-only for specific odd combinations only.

 

Diagnosing "the form went read-only" is just walking those four in order. Do it in that order and you will be right in about a minute, which is faster than the average support ticket round trip.

Note: - Service administrators are not blocked by approval ownership. They can write to a promoted, approved, frozen slice all day.

That is exactly why this class of problem never appears in system testing — testing is done by administrators — and appears in week one of UAT with real planners. Before you hand over, log in as a planner-role test user and walk a full promote cycle. Every time.

9.1 Business rules against locked slices

The collision that costs the most is aggregation. FPAOPX_031 rolls opex up the entity hierarchy. Run it as an administrator and it works. Attach it to a form as an On Save rule and let a planner trigger it after their slice has been promoted, and it either fails on locked cells or completes cheerfully having written nothing where it mattered.

The version that actually hurt us was subtler. The FY27 review meeting froze the Singapore units mid-morning so the numbers would stop moving. At noon the FP&A lead ran the consolidation. FPAOPX_031 could not write to the frozen parents, the job log recorded a warning nobody was watching, and the deck went to the steering committee with Singapore totals a full day stale. Nothing errored. The numbers were just wrong.

 

9.2 Reject does not restore data

Reject sends the approval unit back to the previous owner. The numbers stay exactly as submitted. People assume — reasonably, from every other approval system they have used — that rejection means "put it back how it was." It does not, and there is no undo.

The fix is unglamorous: before the first promotion, Copy Version from Working to Submitted_V1. It costs one administrator job in the calendar and it is the difference between a rejection conversation and a forensic one.

10. Eight ways a cycle stalls

Field notes. Every one of these has happened on a real engagement, most of them on NEXUSFPA.

1.   Entities missing from the hierarchy. Four cost centres were created in August for the new NexusPay lines and never added to the AUH. They were plannable, people typed into them, and they were invisible to workflow. We found out at consolidation when the entity total did not tie to the sum of approved units.

2.   Nobody clicked Start. Status Not Started means approvals is governing nothing at all. The AUH is built, owners are assigned, validation is configured, and the whole thing is decoration until an administrator starts the process.

3.   Secondary dimension explosion. Forty-two cost centres times five verticals. Two hundred and ten approval units, tracked by the FP&A lead in — yes — a spreadsheet.

4.   Owner has left the company. Covered in section 4.3. Assign groups.

5.   The read-only panic. Day one after the first promotion, eleven tickets saying the application is broken. It was working exactly as designed. This is a training and comms failure — put "after you promote, your numbers become read-only" on a slide, in the quick reference card, and in the promotion confirmation message.

6.   Only Budget was governed. We assigned FY27_Budget / Working to the AUH and never assigned Forecast / Working. The quarterly forecast ran ungoverned for three quarters. Nobody complained, which is the worrying part.

7.   Rejection with no snapshot. Section 9.2. Copy Version before the first promote.

8.   Aggregation against frozen parents. Section 9.1. The failure mode that produces wrong numbers instead of error messages, which makes it the worst one on this list.

11. What the FY27 cycle actually looked like

Design discussions about approvals go in circles until somebody puts a calendar on the wall. Here is the NEXUSFPA one, which I now reuse as a starting point on every engagement.

 

Week

What happens

Approvals state

W-2

Administrator opens the scenario period range, loads prior-year actuals and corporate targets into TARGET version, runs seeding rules.

Not Started

W1

Administrator starts the process. Planners enter opex and headcount. Validation rules fire on save.

First Pass

W2

Copy Version to Submitted_V1. Cost centre owners promote. Regional finance reviews.

Under Review at region

W3

Regional review. Two rejections go back to cost centres, get fixed, get re-promoted.

Mixed — this is the week the status screen earns its keep

W4

Regions promote to group. Group FP&A freezes reviewed units, administrator runs FPAOPX_031, board pack built from approved data.

Under Review at group, some Frozen

W5

Steering committee. Group approves. Copy Version from Working to FY27_Final. Scenario period range closed.

Approved

 

Note where the administrator jobs sit — W-2 seeding, W2 snapshot, W4 aggregation, W5 final copy. Four jobs, all owned by one person, all on the calendar. That is the operational half of an approvals design and it never appears in the configuration.

12. Pre-cycle checklist

Run this before the first cycle goes live, not after.

1.   Every plannable entity is in the AUH. Reconcile the member list against the hierarchy, do not eyeball it.

2.   Every approval unit has an owner, and every owner is a group.

3.   Every scenario and version combination you intend to govern is assigned. Say out loud which ones you are deliberately leaving open.

4.   Validate has been run on the hierarchy and returns clean.

5.   The promotional path has been read aloud, with real names, to the people on it.

6.   Every business rule is documented as pre-promotion or post-promotion.

7.   Aggregation is an administrator job on the calendar, not a planner-triggered form action.

8.   The Copy Version snapshot job exists and is scheduled before the first promotion date.

9.   Validation rules that block promotion have been reviewed for whether they should. Advisory ones use colour instead.

10.      Email notification is switched on and one test notification has actually arrived in somebody's inbox.

11.      A full promote-reject-repromote-approve cycle has been walked end to end as a planner-role test user, not as an administrator.

12.      Someone other than you knows how to use Take Ownership and Reassign, and it is written down where they can find it at 6pm on deadline day.

 

13. Quick reference

 

If you need to...

Use

Because

Have cost centre managers build their own numbers

Bottom Up hierarchy

Matches how finance teams already work and is the easiest to train.

Push a corporate target down and get detail back

Distribute hierarchy

Authority starts at the top; children work inside the envelope.

Stop typing while you consolidate

Freeze

Locks the slice without moving it along the promotional path.

Take an entity out of this cycle

Exclude

Cleaner than deleting it from the hierarchy and re-adding it next year.

Cover someone on leave

Delegate, or change group membership

Group membership is cleaner and leaves the designed path intact.

Unblock a unit whose owner is unreachable

Take Ownership, or administrator Reassign

Take Ownership pulls it up the path; Reassign is the override.

Prevent a submission with missing months

Data validation rule with Do Not Promote

Catches it at source instead of at consolidation.

Be able to undo a rejection

Copy Version before first promote

Reject returns ownership, never data.

Know why a form is read-only

Check the four gates in section 9, in order

It is one of exactly four things, and the order is fastest to slowest.

Closing

Approvals is where an EPM Planning application stops being a very good spreadsheet replacement and becomes a process. It is also the module clients cut when the timeline gets tight and then spend the first cycle tracking status in a spreadsheet and wondering why the project did not solve that.

If you take three things from this one: count your approval units before you design anything, assign groups rather than users, and decide for every business rule whether it runs before or after promotion. Those three cover most of what goes wrong.

 

!!Happy Learning!!

Comments

Popular posts from this blog

Oracle EPM Planning - Planning, Budgeting, Forecasting, and Long-Range Planning

Oracle EPM Planning Account Dimension: Complete Guide to Member Properties with Examples

Creating your first EPM Application