Planning Workflow and Approvals: Deciding When a Number Is Final
1. The application works. That is not the same as the budget working.
Blog 9 left our application in a good
place. Cube have data in them. Actuals load through Data Integration every
month. The forms from Blog 7 open in under three seconds and people have
stopped emailing me about zero suppression.
Then we handed it to forty planners for
the FY27 cycle, and within a week the finance director asked a question the
application could not answer: is the Singapore marketing number final?
Nothing in the app knew. The number was
in the cube. Someone had typed it. Whether that someone was done typing,
whether their manager had seen it, and whether it was safe to build the
consolidated board pack on top of it — none of that was anywhere. The FP&A
lead was tracking it in a spreadsheet with 42 rows and a column of colours,
which is exactly the thing we sold them an EPM system to stop doing.
That gap is what Approvals fills. It is
the least glamorous module in EPM Planning and the one that decides whether
your implementation is a modelling tool or an actual planning process.
2.
What Approvals actually is
Approvals is the workflow engine built
into EPM Planning. Strip away the terminology and it does three things:
1.
It assigns
ownership of a slice of data. Not a form, not a
report — a slice. One named person is accountable for those numbers.
2.
It tracks a
status on that slice. Not Started,
First Pass, Under Review, Approved, and so on, visible to everyone with access.
3.
It controls who
can write. This is the one nobody expects. Once a
slice moves up the path, the person who used to own it goes read-only on it.
Point three is why Approvals is not
optional cosmetic workflow. It changes write access at runtime, on top of the
security you already configured. Get it wrong and people who should be planning
cannot type, or people who should be finished still can.
3.
The approval unit is a data slice, and you should count them
Everything in Approvals hangs off one
object: the approval unit. An approval unit is the intersection of
•
one Scenario
member,
•
one Version
member,
•
one member of the
primary approval dimension — Entity, in almost every implementation you will
ever do,
•
and optionally
one member of a secondary dimension.
So at NEXUSFPA, FY27_Budget / Working / C_NX_SG_MKT is one approval
unit: the Singapore marketing cost centre's FY27 budget in the working version.
That is the thing that gets an owner, a status, and a lock.
Now do the arithmetic before you build
anything, because it is the single decision that most often wrecks a cycle:
|
Design |
Approval units |
What review actually feels like |
|
1 scenario
x 1 version x 42 cost centres |
42 |
A review
meeting. One screen, sortable, done in 20 minutes. |
|
Same, plus
a secondary dimension of 5 verticals |
210 |
A
spreadsheet of statuses. Which is what we were replacing. |
|
Same, plus
Budget and Forecast, Working and Final |
840 |
Verbally Nobody
knows what is approved, what was draft and so on. |
Note: The secondary dimension is the most common piece
of over-engineering in an EPBCS approvals design. Use the secondary dimension
only when the two genuine approval is required.
4.
Building the approval unit hierarchy
The approval unit
hierarchy (AUH — older documentation and half the consulting world still calls
it the planning unit hierarchy or PUH) is where you define the whole thing.
Navigator, then Approvals, then Approval Unit Hierarchy, then Create. Four
decisions and then a lot of clicking.
4.1
Approval dimension and type
You pick the
primary dimension and the hierarchy template on the first tab. The dimension is
Entity unless you have a very specific reason. The template is where the
interesting choice lives, and section 5 is entirely about it.
4.2
Primary and subhierarchy selection
This is the tab
people rush. You choose which members of the Entity dimension are actually in
the workflow, and for each parent you decide whether its descendants come
along. Two behaviours to burn into your memory:
•
Enabled vs included. A member can be
in the hierarchy but not enabled for approvals — it will pass status up from
its children without having an owner of its own. Useful for reporting rollups
nobody signs off on.
•
Members you skip do not error. They simply are
not governed. No warning, no flag, no red text.
4.3
Owners and reviewers
Each approval
unit gets exactly one owner and any number of reviewers. Watchers can be added
too — they receive notifications and see status but take no action, which is
the right slot for the CFO who wants visibility without a decision to make
during the initial days of budget process.
If you leave an
approval unit without an assignment, it inherits from the nearest ancestor that
has one. That is a genuinely useful default: assign the regional owner at the
parent, override only where a specific cost centre needs a specific person.
4.4
Scenario and version assignment
The last tab is
the one that makes the hierarchy live. Until you assign a Scenario and Version
combination to the AUH, it is an inert design document. Assign FY27_Budget /
Working and now those slices are governed. Do not assign Forecast / Working and
it stays wide open all year — see failure mode six.
Then Validate,
then Save. Validate catches broken promotional paths and missing owners; run it
and read what it says rather than clicking through.
5.
Bottom Up, Distribute, or Free Form
Three templates.
The difference is not cosmetic — it decides where the process starts and which
direction data authority flows.
|
Template |
How it moves |
Use it when |
The catch |
|
Bottom Up |
Owners at
level 0 enter and Promote upward. Status rolls up the hierarchy. |
Cost
centre managers build their own numbers and finance consolidates. The default
for most budgets, including NEXUSFPA. |
No
mechanism to hand down a target. Corporate targets end up in email. |
|
Distribute |
The top
owner enters targets and distributes downward; children work within them and
submit back up. |
Corporate
sets the envelope first — a revenue target, a headcount cap — and the detail
is filled in underneath. |
The top of
the house must be ready first. If corporate slips a week, forty planners sit
idle. |
|
Free Form |
The
promotional path is chosen by the person promoting, at the moment they
promote. |
The
approval chain genuinely does not follow the entity hierarchy — matrix
organisations, shared service centres. |
You have
traded a designed process for user discretion. Expect inconsistency and no
clean status rollup. |
My opinion, and
it is only that: start Bottom Up. It matches how most finance teams already
work, it is the easiest to explain in training, and the target-setting problem
it does not solve can be handled by loading targets into a separate version and
giving planners a variance column on the form. Distribute is the right answer
roughly one engagement in four, and it is always an engagement where the CFO
drives the calendar personally.
6.
The promotional path
The promotional
path is the ordered list of people an approval unit passes through. You do not
draw it. EPM computes it from the hierarchy plus the owners and reviewers you
assigned, and you can see it on the approval unit before you start the cycle.
For a Bottom Up
hierarchy at NEXUSFPA, the Singapore marketing slice reads roughly like this:
|
C_NX_SG_MKT Owner: SG_MKT_PLANNERS status: First Pass Reviewer: SG_FIN_MANAGERS |
Promote v C_NX_SG Owner: SG_FIN_MANAGERS status: Under Review |
Promote v C_NX_TOTAL Owner: GROUP_FPA status: Under Review |
Approve v
status: Approved |
Read that path
out loud in the design workshop with the actual names in it. It takes four
minutes and it surfaces every org-chart argument you would otherwise discover
in UAT.
7.
Statuses and actions: the state machine
Approvals is a
state machine with a small vocabulary. Learn the states first; the buttons make
sense afterwards.
|
Status |
What it means |
Who can write |
|
Not
Started |
The
process has not begun. Approvals is defined but not governing. |
Whoever
security allows — i.e. approvals is doing nothing yet |
|
First Pass |
Started,
no owner has taken it forward yet. Data entry stage. |
The owner
(and reviewers, depending on your setup) |
|
Under
Review |
Promoted
at least one level. Sitting with a reviewer. |
The
current owner only |
|
Signed Off
/ Not Signed Off |
A reviewer
has recorded an opinion without moving the unit. |
Unchanged
by the sign-off itself |
|
Approved |
Reached
the top of the path and been approved. |
Nobody in
the workflow |
|
Delegated |
Ownership
passed sideways to someone off the designed path. |
The
delegate |
|
Distributed |
Distribute-type
only: targets pushed down, children now working. |
The
children |
|
Action |
Effect |
Notes from the field |
|
Start /
Originate |
Moves Not
Started to First Pass. The cycle is now live. |
Administrators
forget this and wonder why nothing is locked. |
|
Promote |
Sends the
unit to the next person on the path. |
The former
owner loses write access here. Tell people in advance. |
|
Submit |
Distribute-type
equivalent of Promote, moving back up. |
Same lock
behaviour. |
|
Approve /
Reject |
Approve
moves it up or closes it. Reject sends it back down. |
Reject
returns ownership. It does not return the data. |
|
Delegate |
Hands
ownership to someone not on the path. |
Useful for
leave cover. Audit it — delegation chains get untidy. |
|
Take
Ownership |
Pulls
ownership up to a higher-level owner. |
The escape
hatch when someone is unreachable at 6pm on deadline day. |
|
Freeze /
Unfreeze |
Makes the
slice read-only without moving it along the path. |
The right
tool for "stop typing while I run the consolidation." |
|
Exclude /
Include |
Removes an
approval unit from the process, or puts it back. |
For
entities that exist in the hierarchy but are not planned this cycle. |
|
Reassign |
Administrator
override of owner or reviewer. |
Your
emergency button. Keep the list of who can press it short. |
8.
Data validation rules: where workflow becomes policy
This is the
feature that turns Approvals from status tracking into control, and it is
chronically underused. Data validation rules are built in the form designer —
you define a condition on a cell or range, and one of the available actions is
to block promotion.
At NEXUSFPA we
put three of them on the opex entry form:
|
Rule:
FPAOPX_VAL_01 Marketing spend within
policy If
Account = A_NX_MKT_TOTAL Value
> 12% of FPAPLN Net Revenue for the same Entity/Period Then Display cell red Message "Marketing exceeds 12% of
revenue - attach justification" Do Not Promote Rule:
FPAOPX_VAL_02 Cost per FTE sanity
band If
A_NX_PAYROLL_TOTAL / A_NX_HC_CLOSING outside 40,000 - 220,000 Then Display cell amber, Message, promotion
allowed Rule:
FPAOPX_VAL_03 No blank months If
any month in &PlanYear = #Missing for A_NX_OPEX_TOTAL Then Do Not Promote |
Rules fire on
save and again on promote. VAL_03 alone eliminated the annual ritual where
three cost centres submit a budget with September empty and nobody notices
until the phasing looks strange in the board pack.
9.
Where Approvals collides with everything else
Approvals does
not operate in isolation. A planner can write to a cell only when four separate
things agree.
|
Gate |
What it checks |
Typical symptom when it is the culprit |
|
Access
permissions |
Write
access to the dimension members via user or group. |
Read-only
for one user, fine for their colleague. |
|
Approval
ownership |
The user
is the current owner of the approval unit. |
Read-only
for a whole cost centre, and only after promotion. |
|
Scenario /
Version period range |
The period
sits inside the scenario start and end, and the version is not marked
read-only. |
Read-only
for everyone, everywhere, in specific months. |
|
Valid
intersections |
The cell
combination is permitted by your valid-intersection groups. |
Read-only
for specific odd combinations only. |
Diagnosing
"the form went read-only" is just walking those four in order. Do it
in that order and you will be right in about a minute, which is faster than the
average support ticket round trip.
Note: - Service administrators are not blocked by
approval ownership. They can write to a promoted, approved, frozen slice all
day.
That is exactly why this class of problem
never appears in system testing — testing is done by administrators — and
appears in week one of UAT with real planners. Before you hand over, log in as
a planner-role test user and walk a full promote cycle. Every time.
9.1
Business rules against locked slices
The collision
that costs the most is aggregation. FPAOPX_031 rolls opex up
the entity hierarchy. Run it as an administrator and it works. Attach it to a
form as an On Save rule and let a planner trigger it after their slice has been
promoted, and it either fails on locked cells or completes cheerfully having
written nothing where it mattered.
The version that
actually hurt us was subtler. The FY27 review meeting froze the Singapore units
mid-morning so the numbers would stop moving. At noon the FP&A lead ran the
consolidation. FPAOPX_031 could not write to the frozen parents, the job log recorded
a warning nobody was watching, and the deck went to the steering committee with
Singapore totals a full day stale. Nothing errored. The numbers were just
wrong.
9.2
Reject does not restore data
Reject sends the
approval unit back to the previous owner. The numbers stay exactly as
submitted. People assume — reasonably, from every other approval system they
have used — that rejection means "put it back how it was." It does
not, and there is no undo.
The fix is
unglamorous: before the first promotion, Copy Version from Working to Submitted_V1. It costs one
administrator job in the calendar and it is the difference between a rejection
conversation and a forensic one.
10.
Eight ways a cycle stalls
Field notes.
Every one of these has happened on a real engagement, most of them on NEXUSFPA.
1.
Entities missing from the hierarchy. Four cost centres
were created in August for the new NexusPay lines and never added to the AUH.
They were plannable, people typed into them, and they were invisible to
workflow. We found out at consolidation when the entity total did not tie to
the sum of approved units.
2.
Nobody clicked Start. Status Not
Started means approvals is governing nothing at all. The AUH is built, owners
are assigned, validation is configured, and the whole thing is decoration until
an administrator starts the process.
3.
Secondary dimension explosion. Forty-two cost
centres times five verticals. Two hundred and ten approval units, tracked by
the FP&A lead in — yes — a spreadsheet.
4.
Owner has left the company. Covered in
section 4.3. Assign groups.
5.
The read-only panic. Day one after the
first promotion, eleven tickets saying the application is broken. It was
working exactly as designed. This is a training and comms failure — put
"after you promote, your numbers become read-only" on a slide, in the
quick reference card, and in the promotion confirmation message.
6.
Only Budget was governed. We assigned
FY27_Budget / Working to the AUH and never assigned Forecast / Working. The
quarterly forecast ran ungoverned for three quarters. Nobody complained, which
is the worrying part.
7.
Rejection with no snapshot. Section 9.2. Copy
Version before the first promote.
8.
Aggregation against frozen parents. Section 9.1. The
failure mode that produces wrong numbers instead of error messages, which makes
it the worst one on this list.
11.
What the FY27 cycle actually looked like
Design discussions about approvals go in
circles until somebody puts a calendar on the wall. Here is the NEXUSFPA one,
which I now reuse as a starting point on every engagement.
|
Week |
What happens |
Approvals state |
|
W-2 |
Administrator
opens the scenario period range, loads prior-year actuals and corporate
targets into TARGET version, runs seeding rules. |
Not
Started |
|
W1 |
Administrator
starts the process. Planners enter opex and headcount. Validation rules fire
on save. |
First Pass |
|
W2 |
Copy
Version to Submitted_V1. Cost centre owners promote. Regional finance
reviews. |
Under
Review at region |
|
W3 |
Regional
review. Two rejections go back to cost centres, get fixed, get re-promoted. |
Mixed —
this is the week the status screen earns its keep |
|
W4 |
Regions
promote to group. Group FP&A freezes reviewed units, administrator runs
FPAOPX_031, board pack built from approved data. |
Under
Review at group, some Frozen |
|
W5 |
Steering
committee. Group approves. Copy Version from Working to FY27_Final. Scenario
period range closed. |
Approved |
Note where the administrator jobs sit —
W-2 seeding, W2 snapshot, W4 aggregation, W5 final copy. Four jobs, all owned
by one person, all on the calendar. That is the operational half of an
approvals design and it never appears in the configuration.
12.
Pre-cycle checklist
Run this before the first cycle goes
live, not after.
1.
Every plannable
entity is in the AUH. Reconcile the member list against the hierarchy, do not
eyeball it.
2.
Every approval
unit has an owner, and every owner is a group.
3.
Every scenario
and version combination you intend to govern is assigned. Say out loud which
ones you are deliberately leaving open.
4.
Validate has been
run on the hierarchy and returns clean.
5.
The promotional
path has been read aloud, with real names, to the people on it.
6.
Every business
rule is documented as pre-promotion or post-promotion.
7.
Aggregation is an
administrator job on the calendar, not a planner-triggered form action.
8.
The Copy Version
snapshot job exists and is scheduled before the first promotion date.
9.
Validation rules
that block promotion have been reviewed for whether they should. Advisory ones
use colour instead.
10.
Email
notification is switched on and one test notification has actually arrived in
somebody's inbox.
11.
A full
promote-reject-repromote-approve cycle has been walked end to end as a
planner-role test user, not as an administrator.
12.
Someone other
than you knows how to use Take Ownership and Reassign, and it is written down
where they can find it at 6pm on deadline day.
13.
Quick reference
|
If you need to... |
Use |
Because |
|
Have cost
centre managers build their own numbers |
Bottom Up
hierarchy |
Matches
how finance teams already work and is the easiest to train. |
|
Push a
corporate target down and get detail back |
Distribute
hierarchy |
Authority
starts at the top; children work inside the envelope. |
|
Stop
typing while you consolidate |
Freeze |
Locks the
slice without moving it along the promotional path. |
|
Take an
entity out of this cycle |
Exclude |
Cleaner
than deleting it from the hierarchy and re-adding it next year. |
|
Cover
someone on leave |
Delegate,
or change group membership |
Group
membership is cleaner and leaves the designed path intact. |
|
Unblock a
unit whose owner is unreachable |
Take
Ownership, or administrator Reassign |
Take
Ownership pulls it up the path; Reassign is the override. |
|
Prevent a
submission with missing months |
Data
validation rule with Do Not Promote |
Catches it
at source instead of at consolidation. |
|
Be able to
undo a rejection |
Copy
Version before first promote |
Reject
returns ownership, never data. |
|
Know why a
form is read-only |
Check the
four gates in section 9, in order |
It is one
of exactly four things, and the order is fastest to slowest. |
Closing
Approvals is where an EPM Planning
application stops being a very good spreadsheet replacement and becomes a
process. It is also the module clients cut when the timeline gets tight and
then spend the first cycle tracking status in a spreadsheet and wondering why
the project did not solve that.
If you take three things from this one:
count your approval units before you design anything, assign groups rather than
users, and decide for every business rule whether it runs before or after
promotion. Those three cover most of what goes wrong.
!!Happy Learning!!
Comments
Post a Comment